CLIENT                                    SMEC

APPOINTMENT                     2014 – current

PROJECT DESCRIPTION

SANRAL, together with the KZN Department of Transport, is upgrading the existing N2/M41 Mt Edgecombe Interchange North of Durban. The R816 million project consists of a large incrementally launched bridge that will be constructed as a flyover for traffic from the M42 West to the N2 South-bound. This bridge will be 26m high and 947m long, which will make it the longest incrementally launched bridge in South Africa. The second largest bridge of the project will be 18m high and 443m long. In addition to these two large bridges, numerous other structures and road works have been constructed.

SCOPE OF WORK

  • Pre and Post concrete survey checks.
  • Verification of quantities on Contractors Certificate.
  • Layer works checking.
  • Earthworks Setting out.
  • Structural Monitoring of incrementally launched bridges.

KEY SKILLS

  • Construction Surveying
  • Engineering Surveying